






to share with family and friends
























Annual counts of salmon spawning in the American River by the California Department of Fish and Game (CDFG) provided justification for construction of this hatchery.
In cooperation with the CDFG and U.S. Fish and Wildlife Service, the U.S. Bureau of Reclamation designed and built the hatchery, and currently pays the CDFG to operate and maintain it.
The presence of this hatchery is an example of the multiple-use concept of water resource development. The primary purposes of the Folsom Dam project, of which Nimbus is an integral part, are flood control, municipal water supply, power generation and irrigation. In developing the American River for these important purposes, planners included Nimbus Hatchery to mitigate for project impacts on salmon and steelhead populations.




Sperm or "milt" is squeezed from the male salmon and mixed with the freshly taken eggs to fertilize them. A typical salmon has about 5,000 eggs. Female salmon that are not sexually mature and males not needed for fertilizing eggs are returned to the pond to be sorted the next spawning day.


Steelhead remain in the ponds about a year until they are eight to twelve inches in length. All steelhead yearlings are normally planted in the Sacramento River in January and February near Rio Vista.


It is installed in the American River about the middle of September and remains until the run is over. Because the eggs will die before they hatch if the water temperature is too high, the ladder is not opened until the water temperature has cooled to below 60 degrees, usually by the first week of November.





